Signature Flight Support Terminal, Hanger 7

Signature Flight Support Terminal, Hanger 7

Signature Flight Support Terminal, Hanger 7 Project:  Signature Flight Support Terminal, Hanger 7 Category: Tenant Fit-Out Date: In progress Location:  Washington, DC Architect: Schenkel Shultz Architecture Owner: Ronald Reagan Washington National...
Chaps Pit Beef Restaurant

Chaps Pit Beef Restaurant

Chaps Pit Beef Restaurant Project:  Chaps Pit Beef Restaurant Category: Tenant Fit-Out Date: 2018 Location: Frederick, MD Architect: Ballard & Mensua LLC Owner: Chaps Pit Beef Restaurant General Contractor: Silva Contracting Tenant fit-out existing of existing....
Project X

Project X

Project X Project:  Project X Category: Tenant Fit-Out Date: 2017 Location: Germantown, MD Architect: N/A Owner: Recovery Point Systems General Contractor: RPS Piped new chiller on roof with 6″ weld pipe, flushed and tested...
Avendra

Avendra

Avendra Project: Avendra Category: Tenant Fit-Out Date: 2017 Location: Gaithersburg, MD Architect: Faith & Gould Owner: Avendra General Contractor: HSU Builders Installed waste, venting and water piping to the new test kitchen. Installed new VACs and associated...
Smithers Avanza

Smithers Avanza

Smithers Avanza Project: Smithers Avanza Category: Tenant Fit-Out Date: 2017 Location: Gaithersburg, MD Architect: LSY Architects and Laboratory Owner: Smithers Avanza General Contractor: HSU Builders Installed 30+ VRF systems and piping throughout all labs. Installed...